FOSC-400D5INSTALLATION INSTRUCTIONFibre Optic Splice Closure withintegrated organiser system
6.3 Place oval seal over the oval port andcable. Mark the sleeve length onto the cable. 6.4 Match the blue line of the aluminiumcable protection foi
6.7 Shrink down the end of the sleeve onthe cable side. Heat until the sleeve shrinksdown on the cables and take care that thegreen thermo-indicating
7.5 Secure the transportation tubes to thetray with tie wraps as shown.7.6 Arrange the fiber around the tray for storage until the fiber is to be sp
9.2 Place appropriate intertray identification markers on a transportation tube.(Intertray ID markers are marked “1TO” through “8TO” and “1” through
10.6 Secure all trays to the bottom traybracket with the Velcro strap as shown.11.1 Identify each ribbon. Split each ribboninto individual fibers. Fol
12.3 Place the dome carefully over the traysonto the base. Put the clamp around thebase/dome interface. Close the clamp.13.1 Remove the clamp.13.2
14.2 Remove any dirt, mud or other contaminants from the cable sheath forapproximately 2 meters with a clean cloth. Takethe cable seal sleeve from the
14.7 Abrade port and cable sheath circumferentially on the cleaned area with theabrasive strip. Remove any abraded materialwith a clean cloth.14.8 Pla
14.11 Shrink down the end of the sleeve onthe cable side. Heat till the sleeve shrinks downonto the cable and the green thermo-indicating paint is con
TC 443/IP/1 11/95Tyco Electronics, TE logo and FOSC are trademarks.Velcro is a trademark of Velcro Industries B.V.The information given herein, includ
1 General1.1 The installation instruction describes the necessary steps to install the FOSC-400D5. The product may be used on an optical fiber cable u
Number of organizertrays in kit.A closure:0-2B closure:0-4D closure:0-8Ground feed thru lug(s)G = GroundingN = NoneRaychem Customer Specification Nnum
2.2 Content FOSC-400D5-36-1-NNV- Dome with valve- Base with strength member connectionsand one tray assembly- Clamp - Velcro strap- Oval outlet seal k
2.3.4 Loose tube slack trayFOSC-D-BASKET- Slack tray- Tie-wraps2.3.5 Re-entry kitFOSC-D-O-RING-SEAL-KIT- Desiccant- Sealing ring- Cleaning tissue2.4.1
3 General precautions3.1 Do not use damaged sleeve nor trim heat-shrinkable sleeve before installation.3.2 The FOSC-400D5 closures can be installed
4.4 Slide the cables through the openedoval port. Prepare cables as described in section5 (cable preparation).5.1 Remove the cable sheath (and shiel
5.4 Align cable ring cuts with edge of base.Slide strength members into clamps and tighten. Cut away the excess length of strengthmember.5.5 If requi
Comments to this Manuals